Farming investment fund grant: Grants and Allowances

The Grants and Allowances carries 18 published figures read from 6 sources' own pages; the 17 published figures given by item run from 0 to 100 percent, read 24 October 2026.

0 to 100 % Range by item 17 published figures, not one market: read the rows
18 Published figures from 6 source pages, read 25 Oct 2026
7 of 9 Sources read that publish one 78% publish a figure at all
  1. Claim capital allowances: Annual investment allowance - GOV.UK100 %
  2. Funding for farmers, growers and land managers - GOV.UK80 %
  3. Claim capital allowances: Annual investment allowance - GOV.UK50 %
  4. Funding for farmers, growers and land managers - GOV.UK40 %
  5. Claim capital allowances: Annual investment allowance - GOV.UK40 %
  6. Buildings and construction (VAT Notice 708) - GOV.UK20 %
  7. Buildings and construction (VAT Notice 708) - GOV.UK20 %
  8. Slurry Storage10 %
  9. About the Improving Farm Productivity grant round 2, who can apply and what10 %
  10. Buildings and construction (VAT Notice 708) - GOV.UK5 %
  11. Buildings and construction (VAT Notice 708) - GOV.UK5 %
  12. Buildings and construction (VAT Notice 708) - GOV.UK5 %
Every published figure, highest first; the top 12 of 35.
Table view
RowValue
Claim capital allowances: Annual investment allowance - GOV.UK100 %
Funding for farmers, growers and land managers - GOV.UK80 %
Claim capital allowances: Annual investment allowance - GOV.UK50 %
Funding for farmers, growers and land managers - GOV.UK40 %
Claim capital allowances: Annual investment allowance - GOV.UK40 %
Buildings and construction (VAT Notice 708) - GOV.UK20 %
Buildings and construction (VAT Notice 708) - GOV.UK20 %
Slurry Storage10 %
About the Improving Farm Productivity grant round 2, who can apply and what10 %
Buildings and construction (VAT Notice 708) - GOV.UK5 %
Buildings and construction (VAT Notice 708) - GOV.UK5 %
Buildings and construction (VAT Notice 708) - GOV.UK5 %
  1. 110 to 17
  2. 217 to 33
  3. 233 to 50
  4. 150 to 67
  5. 167 to 83
  6. 183 to 100
Where the 18 published figures fall, %, in six equal bands from the lowest to the highest.
Bands
BucketValue
0 to 1711 figures
17 to 332 figures
33 to 502 figures
50 to 671 figure
67 to 831 figure
83 to 1001 figure

7 of the 9 named sources read in full publish a figure; 2 publish none, read 24 October 2026.

By item and scheme

BreakdownMedianRangeSources
itemstorage-capacity-weeks22week22 to 22week1
itemsepa-notice-period30day30 to 30day1
itemlagoon-liner-life20year20 to 20year1
itemslurry-storage-per-m321.36GBP20 to 22.72GBP2
itembase-drainage-assembly1,250GBP1,250 to 1,250GBP1
itemislands-uplift10%10 to 10%1
itemfelling-cost-grant-rate80%80 to 80%1
iteminfrastructure-grant-rate40%40 to 40%1
itemlease-length-threshold35year35 to 35year1
itemstructures-and-buildings-allowance-rate3%3 to 3%1
itemfirst-year-allowance-100100%100 to 100%1
itemfirst-year-allowance-5050%50 to 50%1
itemfirst-year-allowance-4040%40 to 40%1
itemaccounting-period12month12 to 12month1
itemvat-zero-new-dwellings0%0 to 0%1
itemvat-zero-housing-association0%0 to 0%1
itemvat-zero-disability0%0 to 0%1
itemvat-zero-utility-connections0%0 to 0%1
itemvat-reduced-conversion5%5 to 5%1
itemvat-reduced-empty-residential5%5 to 5%1
itemvat-reduced-energy-saving5%5 to 5%1
itemvat-standard-listed-alterations20%20 to 20%1
itemvat-standard-caravan-parks20%20 to 20%1
itemeligible-cost-electricity-cap10%10 to 10%1
itemstore-cover-per-m220.08GBP20.08 to 20.08GBP1
itemseparator-equipment-each24,554GBP24,554 to 24,554GBP1
schemestructures-and-buildings-allowance3%3 to 3%1

Every figure, with its source

One row per published figure: the figure as the source's own page publishes it, the page, and the day it was read. A figure that is not on a page we read is not on this one.

SourceFigureBreakdownRead
Item specification and grant contribution in round 2 of the Slurry Infrastr25,112GBPseparator-equipment-each2026-10-24
Item specification and grant contribution in round 2 of the Slurry Infrastr23,996GBPseparator-equipment-each2026-10-24
Slurry Storage1,250GBPbase-drainage-assembly2026-10-24
Claim capital allowances: Annual investment allowance - GOV.UK100%first-year-allowance-1002026-10-24
Funding for farmers, growers and land managers - GOV.UK80%felling-cost-grant-rate2026-10-24
Item specification and grant contribution in round 2 of the Slurry Infrastr72.74GBPslurry-storage-per-m32026-10-24
Claim capital allowances: Annual investment allowance - GOV.UK50%first-year-allowance-502026-10-24
Funding for farmers, growers and land managers - GOV.UK40%infrastructure-grant-rate2026-10-24
Claim capital allowances: Annual investment allowance - GOV.UK40%first-year-allowance-402026-10-24
Claiming capital allowances for structures and buildings - GOV.UK35yearlease-length-threshold2026-10-24
Item specification and grant contribution in round 2 of the Slurry Infrastr32.17GBPstore-cover-per-m22026-10-24
Item specification and grant contribution in round 2 of the Slurry Infrastr31.5GBPslurry-storage-per-m32026-10-24
Slurry Storage30daysepa-notice-period2026-10-24
Item specification and grant contribution in round 2 of the Slurry Infrastr26.17GBPslurry-storage-per-m32026-10-24
Slurry Storage22weekstorage-capacity-weeks2026-10-24
Slurry Storage20yearlagoon-liner-life2026-10-24
Slurry Storage20GBPslurry-storage-per-m32026-10-24
Buildings and construction (VAT Notice 708) - GOV.UK20%vat-standard-listed-alterations2026-10-24
Buildings and construction (VAT Notice 708) - GOV.UK20%vat-standard-caravan-parks2026-10-24
Item specification and grant contribution in round 2 of the Slurry Infrastr19.27GBPslurry-storage-per-m32026-10-24
Item specification and grant contribution in round 2 of the Slurry Infrastr18.22GBPslurry-storage-per-m32026-10-24
Claim capital allowances: Annual investment allowance - GOV.UK12monthaccounting-period2026-10-24
Item specification and grant contribution in round 2 of the Slurry Infrastr10.08GBPslurry-storage-per-m32026-10-24
Slurry Storage10%islands-uplift2026-10-24
About the Improving Farm Productivity grant round 2, who can apply and what10%eligible-cost-electricity-cap2026-10-24
Item specification and grant contribution in round 2 of the Slurry Infrastr7.99GBPstore-cover-per-m22026-10-24
Buildings and construction (VAT Notice 708) - GOV.UK5%vat-reduced-conversion2026-10-24
Buildings and construction (VAT Notice 708) - GOV.UK5%vat-reduced-empty-residential2026-10-24
Buildings and construction (VAT Notice 708) - GOV.UK5%vat-reduced-energy-saving2026-10-24
Claiming capital allowances for structures and buildings - GOV.UK3%structures-and-buildings-allowance-rate2026-10-24

The sentence each figure was read from (35)

Read in full, publishes no figure

2 named sources were read in full on the dates shown and print no usable figure. They are counted, never filled in.

Methodology

Every row is a verbatim sentence read from the named source's own page through our fetch service on the date shown, hash-pinned to the stored read (the sha of the page's visible text; the raw page is mirrored to R2).

7 of the 9 named sources that could be read published a usable figure; 2 published none and are recorded as not published, never filled in; 0 could not be read (blocked, dead or unreachable) and count nowhere.

The headline figures (median, minimum, maximum, quartiles) are over ONE figure per source for each breakdown it prices, in % (a source's median where its page yielded several accepted sentences for one breakdown), so a page that gives figures for several breakdowns gives one for each and N counts 18 figures, never sentences; 34 candidate sentence(s) were refused by a reviewer with the reason recorded.

The fuller derivation this dataset is chartered to grow into (not yet what the figures above are; they are each source's own published figure as read): one row per scheme per item at the rate the authority states - a grant contribution per cubic metre of slurry storage, a capital allowance percentage per year, a VAT liability - joined to the cost index above so the page can state the NET cost of a building rather than its list price, which is the number the buyer is actually deciding on and which no grant page and no fabricator publishes together

34 candidate sentences on these pages were refused by a reviewer; each refusal and its reason is recorded in the review ledger.

Sources (9)
Cite or embed this figure

The Grants and Allowances carries 18 published figures read from 6 sources' own pages; the 17 published figures given by item run from 0 to 100 percent, read 24 October 2026.

7 of the 9 named sources read in full publish a figure; 2 publish none, read 24 October 2026.

Grants and Allowances, item storage-capacity-weeks: median 22 week across 1 source, read 24 October 2026.

Grants and Allowances, item sepa-notice-period: median 30 day across 1 source, read 24 October 2026.

Grants and Allowances, item lagoon-liner-life: median 20 year across 1 source, read 24 October 2026.

Grants and Allowances, item slurry-storage-per-m3: median 21.36 GBP across 2 sources, read 24 October 2026.

Grants and Allowances, item base-drainage-assembly: median 1,250 GBP across 1 source, read 24 October 2026.

Grants and Allowances, item islands-uplift: median 10 percent across 1 source, read 24 October 2026.

Grants and Allowances, item felling-cost-grant-rate: median 80 percent across 1 source, read 24 October 2026.

Grants and Allowances, item infrastructure-grant-rate: median 40 percent across 1 source, read 24 October 2026.

Grants and Allowances, item lease-length-threshold: median 35 year across 1 source, read 24 October 2026.

Grants and Allowances, item structures-and-buildings-allowance-rate: median 3 percent across 1 source, read 24 October 2026.

Grants and Allowances, item first-year-allowance-100: median 100 percent across 1 source, read 24 October 2026.

Grants and Allowances, item first-year-allowance-50: median 50 percent across 1 source, read 24 October 2026.

Grants and Allowances, item first-year-allowance-40: median 40 percent across 1 source, read 24 October 2026.

Grants and Allowances, item accounting-period: median 12 month across 1 source, read 24 October 2026.

Grants and Allowances, item vat-zero-new-dwellings: median 0 percent across 1 source, read 24 October 2026.

Grants and Allowances, item vat-zero-housing-association: median 0 percent across 1 source, read 24 October 2026.

Grants and Allowances, item vat-zero-disability: median 0 percent across 1 source, read 24 October 2026.

Grants and Allowances, item vat-zero-utility-connections: median 0 percent across 1 source, read 24 October 2026.

Grants and Allowances, item vat-reduced-conversion: median 5 percent across 1 source, read 24 October 2026.

Grants and Allowances, item vat-reduced-empty-residential: median 5 percent across 1 source, read 24 October 2026.

Grants and Allowances, item vat-reduced-energy-saving: median 5 percent across 1 source, read 24 October 2026.

Grants and Allowances, item vat-standard-listed-alterations: median 20 percent across 1 source, read 24 October 2026.

Grants and Allowances, item vat-standard-caravan-parks: median 20 percent across 1 source, read 24 October 2026.

Grants and Allowances, item eligible-cost-electricity-cap: median 10 percent across 1 source, read 24 October 2026.

Grants and Allowances, item store-cover-per-m2: median 20.08 GBP across 1 source, read 24 October 2026.

Grants and Allowances, item separator-equipment-each: median 24,554 GBP across 1 source, read 24 October 2026.

Grants and Allowances, scheme structures-and-buildings-allowance: median 3 percent across 1 source, read 24 October 2026.

Cite as: "agriculturalbuildingcost.co.uk Grants and Allowances", updated 2026-10-25, https://agriculturalbuildingcost.co.uk/datasets/grants-and-allowances/.

Embed this figure (plain HTML, no scripts)

0 to 100 percent

17 of 18 published figures (item), Grants and Allowances, across 6 sources, read 24 October 2026

Source: agriculturalbuildingcost.co.uk Grants and Allowances

Machine-readable: JSON, CSV, Markdown.

Download the CSV (35 rows, computed 2026-10-25)

Get farm building quotes