# Farming investment fund grant: Grants and Allowances

> The Grants and Allowances carries 18 published figures read from 6 sources' own pages; the 17 published figures given by item run from 0 to 100 percent, read 24 October 2026.

Agricultural Building Cost · https://agriculturalbuildingcost.co.uk/datasets/grants-and-allowances/ · computed 2026-10-25

**Range by item:** 0 to 100 % (range 0 to 100 %; 18 published figures; 7 of 9 sources read publish one).

7 of the 9 named sources read in full publish a figure; 2 publish none, read 24 October 2026.

## By item and scheme

| Breakdown | Median | Range | Sources |
|---|---|---|---|
| item storage-capacity-weeks | 22 week | 22 to 22 week | 1 |
| item sepa-notice-period | 30 day | 30 to 30 day | 1 |
| item lagoon-liner-life | 20 year | 20 to 20 year | 1 |
| item slurry-storage-per-m3 | 21.36 GBP | 20 to 22.72 GBP | 2 |
| item base-drainage-assembly | 1,250 GBP | 1,250 to 1,250 GBP | 1 |
| item islands-uplift | 10 % | 10 to 10 % | 1 |
| item felling-cost-grant-rate | 80 % | 80 to 80 % | 1 |
| item infrastructure-grant-rate | 40 % | 40 to 40 % | 1 |
| item lease-length-threshold | 35 year | 35 to 35 year | 1 |
| item structures-and-buildings-allowance-rate | 3 % | 3 to 3 % | 1 |
| item first-year-allowance-100 | 100 % | 100 to 100 % | 1 |
| item first-year-allowance-50 | 50 % | 50 to 50 % | 1 |
| item first-year-allowance-40 | 40 % | 40 to 40 % | 1 |
| item accounting-period | 12 month | 12 to 12 month | 1 |
| item vat-zero-new-dwellings | 0 % | 0 to 0 % | 1 |
| item vat-zero-housing-association | 0 % | 0 to 0 % | 1 |
| item vat-zero-disability | 0 % | 0 to 0 % | 1 |
| item vat-zero-utility-connections | 0 % | 0 to 0 % | 1 |
| item vat-reduced-conversion | 5 % | 5 to 5 % | 1 |
| item vat-reduced-empty-residential | 5 % | 5 to 5 % | 1 |
| item vat-reduced-energy-saving | 5 % | 5 to 5 % | 1 |
| item vat-standard-listed-alterations | 20 % | 20 to 20 % | 1 |
| item vat-standard-caravan-parks | 20 % | 20 to 20 % | 1 |
| item eligible-cost-electricity-cap | 10 % | 10 to 10 % | 1 |
| item store-cover-per-m2 | 20.08 GBP | 20.08 to 20.08 GBP | 1 |
| item separator-equipment-each | 24,554 GBP | 24,554 to 24,554 GBP | 1 |
| scheme structures-and-buildings-allowance | 3 % | 3 to 3 % | 1 |

## Every figure, with its source

One row per source: the figure the source's own page publishes, the page, and the day it was read.

| Source | Figure | Breakdown | Read |
|---|---|---|---|
| [Item specification and grant contribution in round 2 of the Slurry Infrastr](https://www.gov.uk/government/publications/slurry-infrastructure-grant-round-2-applicant-guidance/item-specification-and-grant-contribution) | 25,112 GBP | separator-equipment-each | 2026-10-24 |
| [Item specification and grant contribution in round 2 of the Slurry Infrastr](https://www.gov.uk/government/publications/slurry-infrastructure-grant-round-2-applicant-guidance/item-specification-and-grant-contribution) | 23,996 GBP | separator-equipment-each | 2026-10-24 |
| [Slurry Storage](https://www.ruralpayments.org/topics/all-schemes/agri-environment-climate-scheme/management-options-and-capital-items/slurry-storage/) | 1,250 GBP | base-drainage-assembly | 2026-10-24 |
| [Claim capital allowances: Annual investment allowance - GOV.UK](https://www.gov.uk/capital-allowances/annual-investment-allowance) | 100 % | first-year-allowance-100 | 2026-10-24 |
| [Funding for farmers, growers and land managers - GOV.UK](https://www.gov.uk/guidance/funding-for-farmers) | 80 % | felling-cost-grant-rate | 2026-10-24 |
| [Item specification and grant contribution in round 2 of the Slurry Infrastr](https://www.gov.uk/government/publications/slurry-infrastructure-grant-round-2-applicant-guidance/item-specification-and-grant-contribution) | 72.74 GBP | slurry-storage-per-m3 | 2026-10-24 |
| [Claim capital allowances: Annual investment allowance - GOV.UK](https://www.gov.uk/capital-allowances/annual-investment-allowance) | 50 % | first-year-allowance-50 | 2026-10-24 |
| [Funding for farmers, growers and land managers - GOV.UK](https://www.gov.uk/guidance/funding-for-farmers) | 40 % | infrastructure-grant-rate | 2026-10-24 |
| [Claim capital allowances: Annual investment allowance - GOV.UK](https://www.gov.uk/capital-allowances/annual-investment-allowance) | 40 % | first-year-allowance-40 | 2026-10-24 |
| [Claiming capital allowances for structures and buildings - GOV.UK](https://www.gov.uk/guidance/claiming-capital-allowances-for-structures-and-buildings) | 35 year | lease-length-threshold | 2026-10-24 |
| [Item specification and grant contribution in round 2 of the Slurry Infrastr](https://www.gov.uk/government/publications/slurry-infrastructure-grant-round-2-applicant-guidance/item-specification-and-grant-contribution) | 32.17 GBP | store-cover-per-m2 | 2026-10-24 |
| [Item specification and grant contribution in round 2 of the Slurry Infrastr](https://www.gov.uk/government/publications/slurry-infrastructure-grant-round-2-applicant-guidance/item-specification-and-grant-contribution) | 31.5 GBP | slurry-storage-per-m3 | 2026-10-24 |
| [Slurry Storage](https://www.ruralpayments.org/topics/all-schemes/agri-environment-climate-scheme/management-options-and-capital-items/slurry-storage/) | 30 day | sepa-notice-period | 2026-10-24 |
| [Item specification and grant contribution in round 2 of the Slurry Infrastr](https://www.gov.uk/government/publications/slurry-infrastructure-grant-round-2-applicant-guidance/item-specification-and-grant-contribution) | 26.17 GBP | slurry-storage-per-m3 | 2026-10-24 |
| [Slurry Storage](https://www.ruralpayments.org/topics/all-schemes/agri-environment-climate-scheme/management-options-and-capital-items/slurry-storage/) | 22 week | storage-capacity-weeks | 2026-10-24 |
| [Slurry Storage](https://www.ruralpayments.org/topics/all-schemes/agri-environment-climate-scheme/management-options-and-capital-items/slurry-storage/) | 20 year | lagoon-liner-life | 2026-10-24 |
| [Slurry Storage](https://www.ruralpayments.org/topics/all-schemes/agri-environment-climate-scheme/management-options-and-capital-items/slurry-storage/) | 20 GBP | slurry-storage-per-m3 | 2026-10-24 |
| [Buildings and construction (VAT Notice 708) - GOV.UK](https://www.gov.uk/guidance/buildings-and-construction-vat-notice-708) | 20 % | vat-standard-listed-alterations | 2026-10-24 |
| [Buildings and construction (VAT Notice 708) - GOV.UK](https://www.gov.uk/guidance/buildings-and-construction-vat-notice-708) | 20 % | vat-standard-caravan-parks | 2026-10-24 |
| [Item specification and grant contribution in round 2 of the Slurry Infrastr](https://www.gov.uk/government/publications/slurry-infrastructure-grant-round-2-applicant-guidance/item-specification-and-grant-contribution) | 19.27 GBP | slurry-storage-per-m3 | 2026-10-24 |
| [Item specification and grant contribution in round 2 of the Slurry Infrastr](https://www.gov.uk/government/publications/slurry-infrastructure-grant-round-2-applicant-guidance/item-specification-and-grant-contribution) | 18.22 GBP | slurry-storage-per-m3 | 2026-10-24 |
| [Claim capital allowances: Annual investment allowance - GOV.UK](https://www.gov.uk/capital-allowances/annual-investment-allowance) | 12 month | accounting-period | 2026-10-24 |
| [Item specification and grant contribution in round 2 of the Slurry Infrastr](https://www.gov.uk/government/publications/slurry-infrastructure-grant-round-2-applicant-guidance/item-specification-and-grant-contribution) | 10.08 GBP | slurry-storage-per-m3 | 2026-10-24 |
| [Slurry Storage](https://www.ruralpayments.org/topics/all-schemes/agri-environment-climate-scheme/management-options-and-capital-items/slurry-storage/) | 10 % | islands-uplift | 2026-10-24 |
| [About the Improving Farm Productivity grant round 2, who can apply and what](https://www.gov.uk/government/publications/improving-farm-productivity-grant-round-2-applicant-guidance/about-the-improving-farm-productivity-grant-round-2-who-can-apply-and-what-the-grant-can-pay-for) | 10 % | eligible-cost-electricity-cap | 2026-10-24 |
| [Item specification and grant contribution in round 2 of the Slurry Infrastr](https://www.gov.uk/government/publications/slurry-infrastructure-grant-round-2-applicant-guidance/item-specification-and-grant-contribution) | 7.99 GBP | store-cover-per-m2 | 2026-10-24 |
| [Buildings and construction (VAT Notice 708) - GOV.UK](https://www.gov.uk/guidance/buildings-and-construction-vat-notice-708) | 5 % | vat-reduced-conversion | 2026-10-24 |
| [Buildings and construction (VAT Notice 708) - GOV.UK](https://www.gov.uk/guidance/buildings-and-construction-vat-notice-708) | 5 % | vat-reduced-empty-residential | 2026-10-24 |
| [Buildings and construction (VAT Notice 708) - GOV.UK](https://www.gov.uk/guidance/buildings-and-construction-vat-notice-708) | 5 % | vat-reduced-energy-saving | 2026-10-24 |
| [Claiming capital allowances for structures and buildings - GOV.UK](https://www.gov.uk/guidance/claiming-capital-allowances-for-structures-and-buildings) | 3 % | structures-and-buildings-allowance-rate | 2026-10-24 |
| [Claiming capital allowances for structures and buildings - GOV.UK](https://www.gov.uk/guidance/claiming-capital-allowances-for-structures-and-buildings) | 3 % | structures-and-buildings-allowance | 2026-10-24 |
| [Buildings and construction (VAT Notice 708) - GOV.UK](https://www.gov.uk/guidance/buildings-and-construction-vat-notice-708) | 0 % | vat-zero-new-dwellings | 2026-10-24 |
| [Buildings and construction (VAT Notice 708) - GOV.UK](https://www.gov.uk/guidance/buildings-and-construction-vat-notice-708) | 0 % | vat-zero-housing-association | 2026-10-24 |
| [Buildings and construction (VAT Notice 708) - GOV.UK](https://www.gov.uk/guidance/buildings-and-construction-vat-notice-708) | 0 % | vat-zero-disability | 2026-10-24 |
| [Buildings and construction (VAT Notice 708) - GOV.UK](https://www.gov.uk/guidance/buildings-and-construction-vat-notice-708) | 0 % | vat-zero-utility-connections | 2026-10-24 |

## The sentence each figure was read from (35)

- [Item specification and grant contribution in round 2 of the Slurry Infrastr](https://www.gov.uk/government/publications/slurry-infrastructure-grant-round-2-applicant-guidance/item-specification-and-grant-contribution), read 2026-10-24: "Grant contribution £25,112 each"
- [Item specification and grant contribution in round 2 of the Slurry Infrastr](https://www.gov.uk/government/publications/slurry-infrastructure-grant-round-2-applicant-guidance/item-specification-and-grant-contribution), read 2026-10-24: "Grant contribution £23,996 each"
- [Slurry Storage](https://www.ruralpayments.org/topics/all-schemes/agri-environment-climate-scheme/management-options-and-capital-items/slurry-storage/), read 2026-10-24: "- base drainage sealed pipe assembly to external discharge including double lockable sluice valves: £1250"
- [Claim capital allowances: Annual investment allowance - GOV.UK](https://www.gov.uk/capital-allowances/annual-investment-allowance), read 2026-10-24: "100% first-year allowances"
- [Funding for farmers, growers and land managers - GOV.UK](https://www.gov.uk/guidance/funding-for-farmers), read 2026-10-24: "- up to 80% of felling costs per m3"
- [Item specification and grant contribution in round 2 of the Slurry Infrastr](https://www.gov.uk/government/publications/slurry-infrastructure-grant-round-2-applicant-guidance/item-specification-and-grant-contribution), read 2026-10-24: "Grant contribution £72.74 per m3"
- [Claim capital allowances: Annual investment allowance - GOV.UK](https://www.gov.uk/capital-allowances/annual-investment-allowance), read 2026-10-24: "Full expensing and 50% first-year allowance"
- [Funding for farmers, growers and land managers - GOV.UK](https://www.gov.uk/guidance/funding-for-farmers), read 2026-10-24: "- up to 40% of infrastructure costs"
- [Claim capital allowances: Annual investment allowance - GOV.UK](https://www.gov.uk/capital-allowances/annual-investment-allowance), read 2026-10-24: "40% first-year allowance"
- [Claiming capital allowances for structures and buildings - GOV.UK](https://www.gov.uk/guidance/claiming-capital-allowances-for-structures-and-buildings), read 2026-10-24: "How long you can claim the allowance for If your lease is for 35 years or more"
- [Item specification and grant contribution in round 2 of the Slurry Infrastr](https://www.gov.uk/government/publications/slurry-infrastructure-grant-round-2-applicant-guidance/item-specification-and-grant-contribution), read 2026-10-24: "Grant contribution £32.17 per m2"
- [Item specification and grant contribution in round 2 of the Slurry Infrastr](https://www.gov.uk/government/publications/slurry-infrastructure-grant-round-2-applicant-guidance/item-specification-and-grant-contribution), read 2026-10-24: "Grant contribution £31.50 per m3"
- [Slurry Storage](https://www.ruralpayments.org/topics/all-schemes/agri-environment-climate-scheme/management-options-and-capital-items/slurry-storage/), read 2026-10-24: "You must notify SEPA no later than 30 days prior to commencing the works."
- [Item specification and grant contribution in round 2 of the Slurry Infrastr](https://www.gov.uk/government/publications/slurry-infrastructure-grant-round-2-applicant-guidance/item-specification-and-grant-contribution), read 2026-10-24: "Grant contribution £26.17 per m3"
- [Slurry Storage](https://www.ruralpayments.org/topics/all-schemes/agri-environment-climate-scheme/management-options-and-capital-items/slurry-storage/), read 2026-10-24: "Although the Water Environment (Controlled Activities) (Scotland) Amendment Regulations 2021 state the minimum storage capacity for cattle is 22 weeks, AECS requires you to provide 26 weeks storage for cattle slurry to ensure resilience against increasing rainfall due to climate change."
- [Slurry Storage](https://www.ruralpayments.org/topics/all-schemes/agri-environment-climate-scheme/management-options-and-capital-items/slurry-storage/), read 2026-10-24: "Any slurry storage system with walls made of earth, such as a lagoon, must be lined with an impermeable sheet material* which, with proper maintenance, slurry cannot penetrate for a period of at least 20 years."
- [Slurry Storage](https://www.ruralpayments.org/topics/all-schemes/agri-environment-climate-scheme/management-options-and-capital-items/slurry-storage/), read 2026-10-24: "Payments will be based on the following standard costs: £20 per cubic metre capacity created."
- [Buildings and construction (VAT Notice 708) - GOV.UK](https://www.gov.uk/guidance/buildings-and-construction-vat-notice-708), read 2026-10-24: "approved alterations to listed dwellings and communal residential buildings, and certain listed buildings used by charities (rate shown with effect from 1 October 2012) ― rate of VAT 20% (read section 9)"
- [Buildings and construction (VAT Notice 708) - GOV.UK](https://www.gov.uk/guidance/buildings-and-construction-vat-notice-708), read 2026-10-24: "development of residential caravan parks ― rate of VAT 20% (read section 20)"
- [Item specification and grant contribution in round 2 of the Slurry Infrastr](https://www.gov.uk/government/publications/slurry-infrastructure-grant-round-2-applicant-guidance/item-specification-and-grant-contribution), read 2026-10-24: "Grant contribution £19.27 per m3"
- [Item specification and grant contribution in round 2 of the Slurry Infrastr](https://www.gov.uk/government/publications/slurry-infrastructure-grant-round-2-applicant-guidance/item-specification-and-grant-contribution), read 2026-10-24: "Grant contribution £18.22 per m3"
- [Claim capital allowances: Annual investment allowance - GOV.UK](https://www.gov.uk/capital-allowances/annual-investment-allowance), read 2026-10-24: "You get a new allowance for each accounting period. If your accounting period is more or less than 12 months"
- [Item specification and grant contribution in round 2 of the Slurry Infrastr](https://www.gov.uk/government/publications/slurry-infrastructure-grant-round-2-applicant-guidance/item-specification-and-grant-contribution), read 2026-10-24: "Grant contribution £10.08 per m3"
- [Slurry Storage](https://www.ruralpayments.org/topics/all-schemes/agri-environment-climate-scheme/management-options-and-capital-items/slurry-storage/), read 2026-10-24: "Note: Successful applicants from the islands can expect a 10% uplift on the above rates for slurry storage and slurry ancillary equipment."
- [About the Improving Farm Productivity grant round 2, who can apply and what](https://www.gov.uk/government/publications/improving-farm-productivity-grant-round-2-applicant-guidance/about-the-improving-farm-productivity-grant-round-2-who-can-apply-and-what-the-grant-can-pay-for), read 2026-10-24: "upgrade of electricity supply to the holding (providing this doesn’t add up to more than 10% of the project’s total eligible costs)."
- [Item specification and grant contribution in round 2 of the Slurry Infrastr](https://www.gov.uk/government/publications/slurry-infrastructure-grant-round-2-applicant-guidance/item-specification-and-grant-contribution), read 2026-10-24: "Grant contribution £7.99 per m2"
- [Buildings and construction (VAT Notice 708) - GOV.UK](https://www.gov.uk/guidance/buildings-and-construction-vat-notice-708), read 2026-10-24: "conversion (other than for housing associations) of a non-residential building into a qualifying dwelling or communal residential building and conversions of residential buildings to a different residential use ― rate of VAT 5% (read section 7)"
- [Buildings and construction (VAT Notice 708) - GOV.UK](https://www.gov.uk/guidance/buildings-and-construction-vat-notice-708), read 2026-10-24: "renovation or alteration of empty residential premises ― rate of VAT 5% (read section 8)"
- [Buildings and construction (VAT Notice 708) - GOV.UK](https://www.gov.uk/guidance/buildings-and-construction-vat-notice-708), read 2026-10-24: "installation of energy saving materials, grant funded heating system measures and qualifying security goods ― rate of VAT 5% (read Energy-saving materials and heating equipment (VAT Notice 708/6))"
- [Claiming capital allowances for structures and buildings - GOV.UK](https://www.gov.uk/guidance/claiming-capital-allowances-for-structures-and-buildings), read 2026-10-24: "How the 3% rate of allowance works"
- [Claiming capital allowances for structures and buildings - GOV.UK](https://www.gov.uk/guidance/claiming-capital-allowances-for-structures-and-buildings), read 2026-10-24: "If your chargeable period for capital allowances starts before 1 April or 6 April, apportion the period and claim 2% a year for each day before 1 April or 6 April and 3% a year for each day on or after."
- [Buildings and construction (VAT Notice 708) - GOV.UK](https://www.gov.uk/guidance/buildings-and-construction-vat-notice-708), read 2026-10-24: "construction of new qualifying dwellings and communal residential buildings, and certain new buildings used by charities ― rate of VAT 0% (read section 3)"
- [Buildings and construction (VAT Notice 708) - GOV.UK](https://www.gov.uk/guidance/buildings-and-construction-vat-notice-708), read 2026-10-24: "conversion for a housing association of a non-residential building into a qualifying dwelling or communal residential building ― rate of VAT 0% (read section 6)"
- [Buildings and construction (VAT Notice 708) - GOV.UK](https://www.gov.uk/guidance/buildings-and-construction-vat-notice-708), read 2026-10-24: "alterations to suit the condition of people with disabilities ― rate of VAT 0% (read Reliefs from VAT for disabled and older people (VAT Notice 701/7))"
- [Buildings and construction (VAT Notice 708) - GOV.UK](https://www.gov.uk/guidance/buildings-and-construction-vat-notice-708), read 2026-10-24: "first time gas and electricity connections ― rate of VAT 0% (read Fuel and power (VAT Notice 701/19))"

## Read in full, publishes no figure

- [Farm Business Grant](https://www.gov.wales/farm-business-grant), read 2026-09-12: read in full and no accepted figure on the page
- [[Withdrawn] Farming Transformation Fund Improving Farm Productivity grant -](https://www.gov.uk/guidance/farming-transformation-fund-improving-farm-productivity-grant), read 2026-10-03: every candidate on the page was refused

## Methodology

Every row is a verbatim sentence read from the named source's own page through our fetch service on the date shown, hash-pinned to the stored read (the sha of the page's visible text; the raw page is mirrored to R2). 7 of the 9 named sources that could be read published a usable figure; 2 published none and are recorded as not published, never filled in; 0 could not be read (blocked, dead or unreachable) and count nowhere. The headline figures (median, minimum, maximum, quartiles) are over ONE figure per source for each breakdown it prices, in % (a source's median where its page yielded several accepted sentences for one breakdown), so a page that gives figures for several breakdowns gives one for each and N counts 18 figures, never sentences; 34 candidate sentence(s) were refused by a reviewer with the reason recorded. The fuller derivation this dataset is chartered to grow into (not yet what the figures above are; they are each source's own published figure as read): one row per scheme per item at the rate the authority states - a grant contribution per cubic metre of slurry storage, a capital allowance percentage per year, a VAT liability - joined to the cost index above so the page can state the NET cost of a building rather than its list price, which is the number the buyer is actually deciding on and which no grant page and no fabricator publishes together

## Sources

- [Funding for farmers, growers and land managers - GOV.UK](https://www.gov.uk/guidance/funding-for-farmers) (the publisher's own terms; quoted for reporting and comment)
- [Item specification and grant contribution in round 2 of the Slurry Infrastr](https://www.gov.uk/government/publications/slurry-infrastructure-grant-round-2-applicant-guidance/item-specification-and-grant-contribution) (the publisher's own terms; quoted for reporting and comment)
- [Claiming capital allowances for structures and buildings - GOV.UK](https://www.gov.uk/guidance/claiming-capital-allowances-for-structures-and-buildings) (the publisher's own terms; quoted for reporting and comment)
- [Claim capital allowances: Annual investment allowance - GOV.UK](https://www.gov.uk/capital-allowances/annual-investment-allowance) (the publisher's own terms; quoted for reporting and comment)
- [Buildings and construction (VAT Notice 708) - GOV.UK](https://www.gov.uk/guidance/buildings-and-construction-vat-notice-708) (the publisher's own terms; quoted for reporting and comment)
- [Slurry Storage](https://www.ruralpayments.org/topics/all-schemes/agri-environment-climate-scheme/management-options-and-capital-items/slurry-storage/) (the publisher's own terms; quoted for reporting and comment)
- [About the Improving Farm Productivity grant round 2, who can apply and what](https://www.gov.uk/government/publications/improving-farm-productivity-grant-round-2-applicant-guidance/about-the-improving-farm-productivity-grant-round-2-who-can-apply-and-what-the-grant-can-pay-for) (the publisher's own terms; quoted for reporting and comment)
- [Farm Business Grant](https://www.gov.wales/farm-business-grant) (the publisher's own terms; quoted for reporting and comment)
- [[Withdrawn] Farming Transformation Fund Improving Farm Productivity grant -](https://www.gov.uk/guidance/farming-transformation-fund-improving-farm-productivity-grant) (the publisher's own terms; quoted for reporting and comment)

## Cite or embed

- The Grants and Allowances carries 18 published figures read from 6 sources' own pages; the 17 published figures given by item run from 0 to 100 percent, read 24 October 2026.
- 7 of the 9 named sources read in full publish a figure; 2 publish none, read 24 October 2026.
- Grants and Allowances, item storage-capacity-weeks: median 22 week across 1 source, read 24 October 2026.
- Grants and Allowances, item sepa-notice-period: median 30 day across 1 source, read 24 October 2026.
- Grants and Allowances, item lagoon-liner-life: median 20 year across 1 source, read 24 October 2026.
- Grants and Allowances, item slurry-storage-per-m3: median 21.36 GBP across 2 sources, read 24 October 2026.
- Grants and Allowances, item base-drainage-assembly: median 1,250 GBP across 1 source, read 24 October 2026.
- Grants and Allowances, item islands-uplift: median 10 percent across 1 source, read 24 October 2026.
- Grants and Allowances, item felling-cost-grant-rate: median 80 percent across 1 source, read 24 October 2026.
- Grants and Allowances, item infrastructure-grant-rate: median 40 percent across 1 source, read 24 October 2026.
- Grants and Allowances, item lease-length-threshold: median 35 year across 1 source, read 24 October 2026.
- Grants and Allowances, item structures-and-buildings-allowance-rate: median 3 percent across 1 source, read 24 October 2026.
- Grants and Allowances, item first-year-allowance-100: median 100 percent across 1 source, read 24 October 2026.
- Grants and Allowances, item first-year-allowance-50: median 50 percent across 1 source, read 24 October 2026.
- Grants and Allowances, item first-year-allowance-40: median 40 percent across 1 source, read 24 October 2026.
- Grants and Allowances, item accounting-period: median 12 month across 1 source, read 24 October 2026.
- Grants and Allowances, item vat-zero-new-dwellings: median 0 percent across 1 source, read 24 October 2026.
- Grants and Allowances, item vat-zero-housing-association: median 0 percent across 1 source, read 24 October 2026.
- Grants and Allowances, item vat-zero-disability: median 0 percent across 1 source, read 24 October 2026.
- Grants and Allowances, item vat-zero-utility-connections: median 0 percent across 1 source, read 24 October 2026.
- Grants and Allowances, item vat-reduced-conversion: median 5 percent across 1 source, read 24 October 2026.
- Grants and Allowances, item vat-reduced-empty-residential: median 5 percent across 1 source, read 24 October 2026.
- Grants and Allowances, item vat-reduced-energy-saving: median 5 percent across 1 source, read 24 October 2026.
- Grants and Allowances, item vat-standard-listed-alterations: median 20 percent across 1 source, read 24 October 2026.
- Grants and Allowances, item vat-standard-caravan-parks: median 20 percent across 1 source, read 24 October 2026.
- Grants and Allowances, item eligible-cost-electricity-cap: median 10 percent across 1 source, read 24 October 2026.
- Grants and Allowances, item store-cover-per-m2: median 20.08 GBP across 1 source, read 24 October 2026.
- Grants and Allowances, item separator-equipment-each: median 24,554 GBP across 1 source, read 24 October 2026.
- Grants and Allowances, scheme structures-and-buildings-allowance: median 3 percent across 1 source, read 24 October 2026.

Cite as: "agriculturalbuildingcost.co.uk Grants and Allowances", updated 2026-10-25, https://agriculturalbuildingcost.co.uk/datasets/grants-and-allowances/.

CSV: https://agriculturalbuildingcost.co.uk/datasets/grants-and-allowances.csv
JSON: https://agriculturalbuildingcost.co.uk/datasets/grants-and-allowances.json
Embed (plain HTML, static link back): see https://agriculturalbuildingcost.co.uk/datasets/grants-and-allowances/#median